PRIME GUARD LACCO+ exists because of a pattern anyone who has renovated a building in a monsoon climate already knows: the damage almost never starts where you can see it. It starts at the junction.

Why junctions fail

The wall is fine. The joint is not.

A door frame, a window frame, a plinth belt, a truss bearing. Each of these is a place where two different materials are pressed together and then buried under plaster. One of them nearly always holds water: concrete wicks it, timber absorbs it, and steel corrodes in it.

The buried face never dries out. It has no airflow, no sunlight, and no coat of paint, because nobody paints the side that will not be seen. That is where dampness crosses into the masonry, where termites find timber that is permanently soft, and where rust begins to expand and crack the render around it.

PRIME GUARD LACCO+ treats that face. Three coatings, one for each substrate, each forming a continuous barrier at the point of contact, so the junction stops being the weakest part of the build.

Cutaway of a frame-to-wall junction with a continuous gold barrier layer between the blockwork and the frame, stopping incoming moisture
The treated contact face: the part of the detail nobody sees once the plaster is on.

Protect · Preserve · Perform

What the promise actually means

Protect

Put a physical barrier between the water and the material. Not a sealer that slows moisture down, but a film that stops it crossing the joint at all.

Preserve

Keep the substrate as it was built: concrete sound, timber stable and breathing, steel free of corrosion. Protection that changes the material has not preserved anything.

Perform

Work the way a site works. Direct apply, no primer, recoat in 2–3 hours, hard dry in 5–8, so the barrier never becomes the reason a schedule slips.

Where it is used

Every junction, every build type

New construction

Specified at the frame and belt stage, before plaster. The cheapest moment to protect a junction is the only moment it is fully accessible.

  • Plinth belts
  • Door frames
  • Window frames
  • Truss bearings

Renovation

When a frame comes out or a damp wall is opened up, the exposed contact face can be treated before anything is put back.

  • Damp walls
  • Frame replacement
  • Re-plastering
  • Rusted steel

Joinery & fabrication

Coated in the workshop on trestles, where all faces of a frame are reachable, including the ones that will be buried.

  • Frame runs
  • Plywood
  • Fabricated steel
  • Partitions

The company

Produced & marketed by EB International

PRIME GUARD LACCO+ is produced and marketed by EB International, based in Tanur, Malappuram, Kerala, in the same coastal-monsoon conditions the products were developed for.

Every tin carries the full method, the timings and the safety guidance printed on the label, plus a QR code that resolves to the batch reference number, so what is in your hand can always be traced back.

Address
EB International
21/839.B, Tanur
Malappuram, Kerala
Customer care
+91 9946 102 444
Registered marks
Aqua Block® · Wood Seal® · Rust Shield®
The complete printed Wood Seal label: brand lockup, defence badges, product description, application method, directions for use, coverage, storage and shelf life
Everything on the tin. Nothing held back for a datasheet you have to ask for.
Front of the 1 litre Wood Seal tin Side of the tin showing the moisture-barrier diagram and statutory details Back of the tin showing the application method and directions for use

Protect • Preserve • Perform

Work with us

Dealer and distributor appointments, project supply, or a straight question about a detail on your drawings. We answer all three.